Still at it! Progress on the big red one

Almost exactly a year ago I wrote that progress on the big red one is going nowhere fast. How true…

But more work has been carried out than a quick glance might reveal. 

The roof took a lot of work, not to mention the gutters and drainpipes! And those emergency stairs took quite a few hours to get right. 

Also worth mentioning (in my opinion at least) are the plaster parts. Those are abutments for the annex in the back and the drywall front of the loading dock. 

Ok, enough talk, show us the images! Here goes: 

Image

 

Closeup of gutter and downpipe. The gutter is from Teknobygg of Sweden, the downpipe is a 1mm brass rod: 

Image

 

 

 

I also built a little bumper for the siding serving the building. I would have prefered a finer track for the siding, but thee building is to be palced on a club layout where we use Peco code 75 for all track, so thats what I used. 

 

Image

 

 

The warehouse at its future location: 

 

Image

 

Ok, lets hope for more posts & better progress in 2014!

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s